Innovative Solutions for Compliant and Cost Effective Facilities
For INTERPHEX Live (2017), DME assembled a panel of industry experts to discuss innovative solutions for cGMP Clean Space. DME realizes smart manufacturers are taking a second look at the legacy assumptions and rules of thumb that characterized cleanroom design in the past. Rising costs and space demands are driving creative solutions for more efficient and lower cost cGMP manufacturing. This requires “outside the box” engineering that considers the regulatory requirements, facility program, manufacturing process, CAPEX/OPEX costs, and the latest clean environment construction methods in the context of quality risk management. The panelists included:
- Ed Caulkins, Director of Facility Design, DME
- Blake Hodess, President, Hodess Construction Group
- Charles Johnsrud, Principal, Johnsrud Architects
- Tim Loughran, Cleanroom Construction Associates
Click here to watch the video, provided by INTERPHEX, of the panel discussion from INTERPHEX Live